Apartment development finance in Spain

Financing an apartment block is a different exercise from financing a single house. A multi-unit residential development is usually underwritten against its gross development value across dozens of individual sale contracts rather than one, off-plan reservations can fund part of the build before it’s finished, every unit has to carry statutory buyer protections and a mandatory structural warranty before it can be sold, and the exit is a phased sell-down of separate apartments rather than a single completion. All of that shapes how a lender structures the facility, what it wants to see before releasing money, and how the project is actually sold once built. This guide covers how development finance works specifically for apartment and multi-unit residential projects in Spain.

Talk through financing your apartment development.

What counts as an apartment development

For financing purposes, this covers any multi-unit residential building sold as individual apartments under a horizontal property regime (propiedad horizontal): a small urban infill block of six to twelve units, a mid-size residential complex of thirty to eighty apartments, or a larger phased scheme with several buildings and shared amenities. What all of these share, and what separates them from a single villa or a small number of townhouses, is that the lender is underwriting a sell-down across many buyers rather than one sale, and the build itself has to satisfy building regulations written around multi-occupancy residential use from the outset.

GDV-based lending and loan-to-cost

Apartment development finance is typically structured around two linked figures: loan-to-cost (LTC), the facility as a percentage of total build cost, and loan-to-GDV, the facility as a percentage of the project’s projected gross development value once every unit is sold. Lenders commonly advance up to around 60% to 70% of total costs, or up to roughly 55% to 65% of GDV, whichever is lower, with the exact figures moving on location, the strength of the pre-sales, and the developer’s track record. Our GDV calculation guide and good developer margin guide cover how to build a realistic GDV figure, and it’s worth stress-testing it against a range of per-unit sale prices rather than a single optimistic number, since the whole facility is sized against it.

Off-plan pre-sales and how they affect the facility

Pre-selling units off-plan, before or during construction, is far more central to apartment finance than it is to a single villa or house build. A strong pre-sales ratio, commonly 30% to 50% of units reserved or exchanged before drawdown, materially improves the terms a lender will offer, since it demonstrates real market demand and reduces the lender’s exposure to sales risk on completion. Reservation deposits and exchange deposits from buyers can also be factored into the funding structure itself, reducing how much senior debt or private capital the developer needs to raise. The trade-off is that every euro taken as a deposit from an off-plan buyer in Spain carries a statutory protection obligation, covered below, that has to be arranged and funded before marketing starts.

Buyer deposit guarantees are a legal requirement, not an option

Under Ley 38/1999 (Ley de Ordenación de la Edificación) and related legislation, a developer selling residential units off-plan in Spain must guarantee any deposits or stage payments taken before completion, either through a bank guarantee (aval bancario) or an insurance bond (seguro de caución), per current legal guidance on off-plan buyer protections. If the building isn’t finished and delivered on the agreed date, the buyer is entitled to recover their deposit in full through the guarantee. This isn’t a minor administrative step: the guarantee has to be arranged and funded, usually through a facility with the same bank providing development finance or a separate insurer, before any deposit can legally be taken from a buyer, and the cost and capacity of that guarantee line needs to be built into the project’s funding plan from day one, not treated as an afterthought once sales start.

Staged drawdowns tied to build certificates

As with any development facility, funds are released in stages against a quantity surveyor’s certification of work completed, not in a single lump sum. On an apartment scheme, that certification typically follows the build through foundations, structure, envelope and roof, and internal fit-out across the whole building or phase, rather than a single dwelling, and a lender will usually also want visibility on sales progress at each drawdown, treating a stalling pre-sales pipeline as a risk signal alongside construction progress itself. Our GDV and margin guides above are worth revisiting at each drawdown milestone, not just at the outset, since build cost and sales price assumptions both move over a multi-year scheme.

The 10-year structural warranty and other mandatory cover

Every unit in a residential development sold by a professional developer must carry the seguro decenal, a mandatory 10-year structural warranty required under Ley de Ordenación de la Edificación, covering defects that affect the stability and safety of the building. Per current guidance on the decenal warranty, this sits alongside shorter, often voluntary warranties: one year for minor finishing defects and three years for defects affecting habitability. A lender financing an apartment scheme will expect proof this cover is arranged before completion certificates and individual title deeds can be issued to buyers, since without it, units legally can’t be sold on to residential owners. All-risk construction insurance and third-party liability cover during the build itself sit on top of this and should be budgeted alongside the decenal policy, not as a separate afterthought.

The exit: selling down individual units

Where a single villa or house has one exit, sell the finished asset to one buyer, an apartment scheme exits through a phased sell-down of many individual units, each requiring its own licencia de primera ocupación (first occupation licence) confirmation, its own notarised sale, and often its own buyer mortgage approval. A lender assessing exit risk on an apartment scheme looks closely at absorption rate, how many units a comparable local scheme has typically sold per month or quarter, rather than assuming the whole building sells at once. A facility that assumes rapid full sell-out on completion, without a realistic sales absorption timeline, is one of the more common reasons an otherwise well-built apartment scheme runs into a funding gap in its final months.

The community of owners and shared costs

Once units start selling, the building becomes subject to Spain’s horizontal property law, and a community of owners (comunidad de propietarios) has to be formally constituted, with shared costs, such as lift maintenance, communal gardens, or a shared pool, apportioned by each unit’s participation quota. A developer typically covers the community fees on any unsold units directly, which is a real, ongoing cost during a slow sell-down that’s easy to underestimate when the facility is first structured. Building a realistic community-fee carry cost into the funding plan for the period between practical completion and full sell-out avoids this becoming an unplanned drain on the developer’s own cash during exactly the phase when margin should be crystallising.

Common mistakes

  • Underfunding the deposit guarantee line: treating the aval bancario or seguro de caución as a minor line item rather than a facility that needs its own capacity and cost built in from the outset.
  • Assuming full sell-out on completion: realistic absorption rates, not a single bulk sale assumption, should drive both the GDV timeline and the lender’s exit assessment.
  • Leaving the seguro decenal until late in the build: without it in place, individual title deeds and completion certificates can’t be issued, which can stall the whole sell-down.
  • Ignoring community fee carry on unsold units: an extended sell-down period means the developer is funding shared building costs on every unit still on the books.

Where this fits into the wider process

Our buying land for development guide and planning permission guide cover the earlier stages that determine whether a site can actually support a multi-unit scheme, and our how to set up a property development company guide covers the structure most multi-unit developers build through. If the project sits at the higher end of the market instead, luxury villa development finance covers how single high-spec dwellings finance differently. For the capital stack itself, our private lending vs. bank finance comparison and alternative property finance guide cover the routes available beyond a standard bank facility, and our how much money do you need to develop property in Spain guide is worth running early to check the overall funding picture before committing to a scheme.

Structure the right finance for your apartment scheme.

FAQs: apartment development finance in Spain

How much can I borrow to develop an apartment block in Spain?

Lenders typically advance up to around 60% to 70% of total build cost, or up to roughly 55% to 65% of projected GDV, whichever is lower, with the exact figures depending on location, pre-sales strength, and developer track record.

Not always, but a pre-sales ratio of around 30% to 50% materially improves the terms on offer, since it demonstrates real demand and reduces the lender’s exposure to sales risk.

Yes. Under Ley 38/1999 and related legislation, any deposit or stage payment taken from an off-plan buyer must be guaranteed through a bank guarantee (aval bancario) or an insurance bond (seguro de caución), refundable in full if the building isn’t delivered as agreed.

It’s a mandatory 10-year structural warranty required under Spanish building law for any residential development sold by a professional developer. Without it, individual title deeds and completion certificates can’t be issued to buyers.

Lenders look at realistic absorption rates, how many comparable units typically sell per month or quarter in that area, rather than assuming the whole building sells at once on completion.

The developer, as the owner of any unsold units, is responsible for their share of community of owners costs until each unit sells, which should be budgeted as a carry cost for the sell-down period.

This article is for informational purposes only and does not constitute financial, tax, or legal advice. Spanish property, tax, and lending rules change regularly and depend on your specific circumstances. Always consult an authorised mortgage broker, a qualified Spanish tax advisor, and an independent legal professional before entering into property or financing agreements.

Picture of Chad Harwood-Jones

Chad Harwood-Jones

With a wealth of entrepreneurial experience , Chad brings a unique perspective to Baleario. Having launched and led multiple successful ventures, he moved to Mallorca a number of years ago, experiencing the complexities of settling in Spain firsthand. Today, he combines his expertise in finance, real estate, and insurance to offer expats in Spain comprehensive services tailored to their unique needs.