Gross development value, GDV, is the single number every development finance facility in Spain is sized against, and it’s also the number developers and lenders most often disagree on. Get it wrong in either direction and the consequences are different but both costly: overestimate it and a lender’s own valuation comes in short of what you need to draw down; underestimate it and you may pass on a viable project or accept worse terms than the numbers actually support.
This guide works through exactly how GDV is calculated, with a worked example, and covers why the figure you calculate yourself can differ meaningfully from what a lender’s valuer comes back with. For how GDV feeds into your actual profit, see our guide on how profitable property development is in Spain.
Get an independent read on your project’s GDV.
What is gross development value (GDV)?
Gross development value is the total sale value of a completed development if every unit sold today, at full market price, before any costs, finance, or tax are deducted. It is not profit, and it is not project cost; it is the top line both of those figures are measured against.
For a single villa, GDV is simply the expected sale price of that one property. For a multi-unit scheme, GDV is the sum of every unit’s expected sale price added together.
The comparable sales method, step by step
This is the standard approach for residential development in Spain, and the one both you and a lender’s valuer will use.
- Identify 3 to 5 truly comparable properties: same area, similar size, similar specification, sold (not just listed) within the last 6 to 12 months.
- Convert each comparable to a price per square metre, using built area consistently across every comparable.
- Adjust for differences: a comparable with a pool, sea view, or higher specification needs a downward adjustment if your project lacks that feature, and vice versa.
- Apply the adjusted price per square metre to your own project’s total built area to estimate a per-unit sale price.
- Multiply by the number of units (or simply use the single figure for a one-unit project) to reach total GDV.
A worked example
A small development of 3 villas, each with 220m² of built area, in a market where recent comparable sales average €4,300 per m² for a similar specification:
Line | Figure |
Comparable price per m² | €4,300 |
Built area per villa | 220m² |
Estimated sale price per villa | €946,000 |
Number of units | 3 |
Total GDV | €2,838,000 |
That total GDV of €2,838,000 is the figure a lender will size a development facility against, typically advancing a percentage of GDV rather than a percentage of cost. It’s also the top-line figure used to calculate profit on GDV, the measure most lenders underwrite against, which our earlier profitability guide covers in full alongside how it compares to profit on cost.
Why two valuations of the same project can differ
It is common for a developer’s own GDV estimate and a lender’s valuation to differ by a meaningful margin, sometimes by hundreds of thousands of euros on a mid-size project. The gap usually comes down to a handful of specific choices, not a disagreement about the market itself, as a detailed breakdown of how GDV is actually calculated sets out clearly.
- Asking prices vs. achieved prices: a developer’s own research often leans on current listings, which run higher than what similar properties actually sold for.
- Conservative comparables: a lender’s valuer typically selects the more cautious end of the comparable range, or applies a lower rate per square metre than the developer assumed.
- Sale-period assumptions: some valuations are based on the price achievable within a defined marketing period, commonly around 180 days, rather than an unconstrained best-case sale.
- Specification assumptions: finish quality, ceiling height, and window specification all move the number, and two valuers can reasonably assume different standards for the same set of architectural plans.
How lenders use GDV to size a facility
A development finance facility is typically sized as a percentage of GDV rather than a percentage of project cost, which is why an optimistic GDV estimate that a lender’s valuer doesn’t support can leave a funding gap partway through the build. Private debt lenders sometimes work from a developer’s own GDV case with less independent scrutiny, but usually at a higher cost of capital in exchange for that flexibility.
Because the facility size depends on GDV, and the equity you need to bring depends on the gap between facility size and total project cost, an inflated GDV estimate at the planning stage is one of the most common reasons a project’s real capital requirement comes in higher than first budgeted.
GDV, cost, and profit: how the three numbers connect
GDV is one half of every profitability calculation on a development project. Subtract total project cost from GDV to reach gross profit, then divide that profit by GDV to reach profit on GDV, the measure most lenders underwrite against. Get GDV wrong at the outset and every downstream number, facility size, required equity, and projected margin, moves with it.
Location and comparables: why market selection matters here too
GDV is only as reliable as the comparable evidence behind it, which makes market selection part of the calculation, not a separate decision. Our best places to develop property in Spain guide and Mallorca vs. Marbella comparison both cover current per-market pricing data that feeds directly into a comparable sales calculation, and luxury villa development locations often carry thinner comparable evidence, which is exactly why valuations can vary more widely at the top end of the market.
If you’re still deciding whether development is the right route at all, our guide to becoming a property developer in Spain walks through the wider process this fits into.
Get a GDV estimate that survives a lender’s own valuation.
FAQs: calculating GDV in Spain
What is the difference between GDV and profit?
GDV is the total expected sale value of a completed development before any costs are deducted. Profit is what remains after subtracting total project cost, including land, construction, fees, financing, and tax, from that GDV figure.
How do lenders calculate GDV for a Spanish development loan?
Lenders typically use the comparable sales method: identifying recently sold, similar properties in the same area, converting them to a price per square metre, and applying that rate to the project’s own built area, often with more conservative adjustments than a developer’s own estimate.
Why did my lender's GDV valuation come in lower than my own estimate?
The most common reasons are using achieved sale prices rather than asking prices, applying a shorter assumed marketing period, and using more cautious comparables or specification assumptions than the developer used in their own calculation.
Does GDV include VAT or selling costs?
No. GDV is the gross sale value before VAT, agent fees, legal fees, or capital gains tax are deducted. Those costs are subtracted separately when calculating net profit.
How much does GDV typically move between planning stage and completion?
It varies by project and market, but GDV estimates in fast-moving or thinly-traded markets carry more uncertainty, since comparable evidence can be limited or can shift meaningfully over a build timeline of a year or more.
This article is for informational purposes only and does not constitute financial, tax, or legal advice. Spanish property, tax, and lending rules change regularly and depend on your specific circumstances. Always consult an authorised mortgage broker, a qualified Spanish tax advisor, and an independent legal professional before entering into property or financing agreements.